- Post Tag
Pre-Build
Pre-Build Updates...
Continued installing the base plate around the foundation....
Michael
22nd June 2019
First day of 'putting up the house'. We had a dry run at putting wall 2...
Michael
22nd June 2019
With the structural blocks on site, it was time to get organised & ensure ALL the...
Michael
17th June 2019
Loading more posts...
More Tags…
April 2019 (7)
April 2024 (3)
Architect (4)
August 2019 (7)
Bathrooms (5)
Bedrooms (6)
December 2023 (2)
Decking (4)
Delivery (7)
Drainage System (1)
Drains (1)
Eco-Products (1)
Eco-Store (2)
External Walls (17)
Foundations (17)
Gallery (68)
Groundworks (14)
Internal Walls (8)
January 2024 (1)
July 2019 (12)
July 2023 (1)
June 2019 (14)
June 2023 (1)
June 2024 (1)
Kitchen (2)
Lessons (4)
Living Room (3)
March 2019 (1)
March 2024 (1)
May 2019 (13)
October 2019 (6)
Pipework (3)
Pre-Build (3)
Roof (16)
SARL French Plans (1)
September 2019 (1)
September 2020 (2)
September 2022 (1)
September 2023 (1)
Setbacks (9)
Veranda (8)
Video (3)
Wardrobes (1)
Weather Damage (5)
Windows (7)