- Post Tag
August 2019
August 2019 Updates...
Onto the last stretch of the main structural build. Three more sections were added to the...
Michael
2nd September 2019
The final panels for the en-suite bathroom are in place; the internal walls are now complete....
Michael
2nd September 2019
The doorway and upper tier panels for the main bedroom are now in place....
Michael
24th August 2019
Effectively making use of the 'hallway' space between the two bedrooms, each bedroom has a built-in...
Michael
24th August 2019
Today Tony added the upper panels for the main bathroom, completing work on the internal walls...
Michael
24th August 2019
With Tony working on his own, it made more sense to make progress on the remaining...
Michael
19th August 2019
Loading more posts...
More Tags…
April 2019 (7)
April 2024 (3)
Architect (4)
August 2019 (7)
Bathrooms (5)
Bedrooms (6)
December 2023 (2)
Decking (4)
Delivery (7)
Drainage System (1)
Drains (1)
Eco-Products (1)
Eco-Store (2)
External Walls (17)
Foundations (17)
Gallery (68)
Groundworks (14)
Internal Walls (8)
January 2024 (1)
July 2019 (12)
July 2023 (1)
June 2019 (14)
June 2023 (1)
June 2024 (1)
Kitchen (2)
Lessons (4)
Living Room (3)
March 2019 (1)
March 2024 (1)
May 2019 (13)
October 2019 (6)
Pipework (3)
Pre-Build (3)
Roof (16)
SARL French Plans (1)
September 2019 (1)
September 2020 (2)
September 2022 (1)
September 2023 (1)
Setbacks (9)
Veranda (8)
Video (3)
Wardrobes (1)
Weather Damage (5)
Windows (7)