Build | External Walls
Friday 21st June 2019
Where’s the Bathroom Window?
Rain today so we decided to clear up the site.
However we discovered an issue again with the drawings. The drawings again didn’t tie up with the original architects drawing and we now have a bathroom window with an internal wall half way through it.
In the picture below the left most panel with the notch out of the top left corner is 491 mm too wide and will need to be cut back and two new panels manufactured to fill the gap at the left hand end. Very frustrating.
Groundwork – Opportunity to Tidy
As it was raining today we decided to do some clearing up. The big pile of garden rubbish that was the product of clearing the site of many years worth of brambles has been moved to the back of the site to be left to rot down. That should cheer up the neighbours.
The mound will be covered in earth an allowed to go back to nature.