Build | Preparation
Monday 17th & Tuesday 18th June 2019
First build issue encountered…
Monday
First day of ‘putting up the house’. We had a dry run at putting wall 2 together and it went well – no issues encountered but it was difficult due to pre-cut locator plates not being labelled. I had to work out where the locator plate was in the jigsaw. The panels can be handled by two people fairly easily at ground level. The fun will start when we get above ground level.
Tuesday
First issue encountered. The walls are secured to the foundation by means of a wood base plate anchored to the foundation by chemically fixed threaded stud plus washer and nut. The wood base plate supplied is too narrow and therefore we had to add additional wood to the base plate by means of screwing and gluing a 36mm batten. That exercise has cost half a day.
Issue resolved and we can move on.